flood defence

statical measurement of a flood defence for the housing development Rhine riverside „Alte Ziegelei“ in Speyer incl. the statical formwork and structural drawings Owner: LBBW Immobilien GmbH
– planning consortium Dippon + Pignataro (2013-2014)

nail wall

new build of a double-home with garage in Korb – creation of a permanent nail wall for propping up existing neighbour stonewall along the adjacent land – dp-engineering (2013)

project for the creation of a garage in Corvara (Bolzano): garage with 2 floors and a temporary nail wall
h = 3,00…9,60 m
project at Kauer Ingenieure GmbH (2011)

Residence Holzknecht-Welponer – alteration and expansion of the home: temporary nail wall along the street h = 7,00 m and propping up of the building weight with an enclosed nail wall h = 5,00 m
project at Kauer Ingenieure GmbH (2011)

Rieper Palettenlager – creation of a palette depot in Vintl (Bolzano): temporary nail wall along the adjacent land on the roadside h = 3,00 m
project at Kauer Ingenieure GmbH (2010)

Pizzeria Markus – Variante Hotel Almhof: creation of a temporary nail wall along the adjacent land h = 3,00 m
project at Kauer Ingenieure GmbH (2010)

Hotel Goldknopf (****) – qualitative expansion of the Hotel Goldknopf on the Seiser Alm (Bolzano): creation of a temporary nail wall along an existant house to excavation support h = 3,00 m
project at Kauer Ingenieure GmbH (2010)

Alpina Dolomites (*****) on the Seiser Alm (Bozen): underground connection tunnel between the garage entry and the hotel with a temporary nail wall h=8,00m
project at Kauer Ingenieure GmbH (2010)

micro piles walls

new build of the retirement home Stiftung Haus Hl. Vinzenz (Bolzano) – new build of an underground garage with 3 floors in the center of Bolzano with an excavation depth of 11,00 m and in all directions. Creation of a micro pile wall as excavation support for the creation of the three underground floors.
project at Kauer Ingenieure GmbH (2011)

ZSZ Tiers – creation of a civil protection center Errichtung des Zivilschutzzentrum Tiers für FFW und BRD: Errichtung einer temporären Mikrobohrpfahlwand entlang der Hangseite mit einer Höhe von h = 13,40 m
project at Kauer Ingenieure GmbH (2011)

pizzeria Markus – Variante Hotel Almhof: creation of a temporary micro piles wall along the adjacent land to the neighbour building and to the street h = 9,00 m
project at Kauer Ingenieure GmbH (2010)

embankment dimensioning

Hotel Goldknopf (****) – qualitative expansion of the Hotel Goldknopf on the Seiser Alm (Bozen): dimensioning of the legitimate embankment along the excavation pit
project at Kauer Ingenieure GmbH (2010)

diaphragm wall

creation of a garage at the house Ciamin and the miniature golf course in Überwasser-Kastelruth (Bolzano): creation of a diaphragm wall for the excavation support of the garage against pushing water
project at Kauer Ingenieure GmbH (2011)

cantilever retaining wall

structural planning of a new retaining wall for Sachsenheimer Fertighaus in Sinsheim-Weiler – dp-engineering (2020)

redevelopment of a retaining wall and a path in Stuttgart; planning of wing assembly for a retaining wall at a slope and site supervision acc. HOAI (Lph 1+8) – dp-engineering (2018-2019)

statical assessment and deployment of a sanitation concept with statement of costs for a slope protection and a high retaining wall  in Ispringen – dp-engineering (2018)

Rieper Palettenlager – creation of a palette depot in Vintl (Bolzano): deployment of a cantilever retaining wall along the adjacent land to the roadside h = 4,00 m
project at Kauer Ingenieure GmbH (2010)